CO-PACKER INTAKE SOFTWARE

Collect the project once.
Assess fit from the same brief.

Vardello gives every new prospect one guided intake. Their product, packaging, run size, process, formula status, certifications, and timing are organized into a consistent project brief and checked against criteria your team approves.

QualifiedNeeds reviewNot a fit

01 / THE INTAKE GAP

A contact form records interest. It does not establish production fit.

A name, email, and open text box leave sales or operations to reconstruct the manufacturing request. The first useful review starts only after the missing specifications have been collected and translated into the terms your plant uses.

01

Specifications arrive in pieces

Packaging is in one email, volume in another, and formula readiness is still implicit.

02

The same gaps trigger the same follow-up

Teams repeatedly ask for first-run volume, package details, process, certifications, and timing.

03

Fit depends on plant criteria

A plausible project can still conflict with a line, minimum, process, certification, or lead-time requirement.

02 / FROM INQUIRY TO REVIEW

One path from opening inquiry to a reasoned result.

  1. 01 / COLLECT

    Ask the relevant manufacturing questions.

    The intake branches by the answers the prospect gives, so a can, bottle, and pouch do not produce the same packaging follow-up.

  2. 02 / CHECK

    Apply criteria your team has approved.

    Known requirements are compared with your supported categories, configurations, processes, minimums, certifications, and timing rules.

  3. 03 / REVIEW

    Receive the facts, result, and reasons together.

    The brief distinguishes a supported requirement, a known conflict, and an unanswered fact that still needs a person.

03 / WHAT THE BRIEF NEEDS

The core facts behind an initial fit decision

The exact questionnaire is configured for the plant. These are the recurring groups of information that turn a general inquiry into a reviewable manufacturing project.

Decision areaWhat to collectWhy it matters
ProductCategory and a clear description of what will be manufactured.Determines whether the project belongs in a capability set the plant has approved.
PackagingContainer type, material, size, profile, and applicable package features.Prevents a broad “we run cans” statement from being treated as support for every can configuration.
ProcessRequested or already established filling and processing requirements.Separates a listed product category from the process this specific formula and package require.
Commercial scaleFirst-run units per SKU and expected annual volume.Makes the quantity basis explicit before it is compared with a minimum or review threshold.
ReadinessFormula status, required certifications, and requested production date.Routes an early concept differently from a production-ready project without pretending to quote it.

04 / EXAMPLE OUTPUT

A concise brief, with uncertainty left visible.

FICTIONAL QUALIFICATION EXAMPLENOT A CUSTOMER RESULT

INCOMING PROJECT

A functional beverage brand requests a 12 fl oz sleek can and a 50,000-unit first run per SKU.

Formula
Production-ready
Process
Hot fill
Certification
Non-GMO required
Timing
Seven months from submission
QUALIFIED

The submitted facts meet the fictional plant’s configured category, package, process, run-size, certification, and lead-time criteria.

Illustrative project and plant criteria. A real result uses the manufacturer’s reviewed capabilities and rules.

05 / OPERATING BOUNDARIES

Qualification prepares the decision. It does not replace it.

Vardello supports the initial assessment while keeping technical, commercial, and scheduling authority with the manufacturer.

  • 01

    It does not calculate or send a production quote.

  • 02

    It does not promise live production capacity or a production date.

  • 03

    It does not infer regulatory approval from a product category or ingredient.

  • 04

    It does not hide unknowns or automatically reject a prospect because an answer needs review.

15 MINUTES. NO PREPARATION NEEDED.

See what your plant’s intake
could look like.

In 15 minutes, we’ll show you an example and discuss the details your team needs before pursuing a project.

Have a questionnaire or a recent inquiry? You’re welcome to bring it. Neither is required.